Lesson 8 of 10 · 7 min
The Installation Process
From roof survey to Plant ON in nine stages.
A home solar project moves from a roof survey and 3D design, through booking and DISCOM approval, to an installation that usually takes one day. The DISCOM then fits the net meter, the plant is switched on and monitored, and the subsidy is credited to the bank account.
From survey to switch-on
- Survey: Roof measured, shade checked.
- 3D design: Layout and savings modelled.
- Booking: Advance and documents.
- Approval: DISCOM feasibility.
- Installation: Usually one day.
- Net meter: Installed by the DISCOM.
- Plant ON: Commissioned and monitored.
- Subsidy: Credited to the bank account.
Frequently asked questions
How long does rooftop solar installation take?
The installation on the roof usually takes one day once materials reach the site. Approvals and the net meter take longer.
When is the solar subsidy paid?
After the net meter is installed and the system is inspected, the subsidy is credited to the homeowner’s bank account.
Next lesson: Generation & Consumption